Gas

Project software for gas contractors in the UK.

For contractors working for Cadent, SGN, Northern Gas Networks and Wales & West Utilities. A rolling mains replacement programme, service transfers and reinstatement on one programme, with the fixed order of work that gas demands.

UPrince is project software for gas contractors in the UK. Mains replacement, service transfers, new connections and reinstatement sit on one programme. Gangs record tests, checklists and photos on site, and the as-laid record and reinstatement for each section are ready for the network.

What the job really asks for today

Mains replacement, street by street

The remaining Tier 1 iron mains have to go by 2032. Plan the rolling programme street by street, with permit windows and customer letters planned in.

Service transfers and reconnections

Every property on the street needs its service transferred and reconnected. Status per address, so the supervisor sees what is still open.

As-laid and reinstatement per section

Record the as-laid main, tests and the reinstatement for each section on the job sheet, on site, not typed up afterwards.

Qualifications in date

Plan gangs on their cards and qualifications, and see before the start whether everyone is allowed to do what is planned.

No surprise overruns

When the ground does not match the drawings, see straight away what moves, so a Section 74 overrun does not come as a surprise.

Modules that make the difference on gas work

For gas, these are the modules we see carry the most weight.

From the field

In gas work, the order of operations is critical; skipping a step is not an option. We used to have paper checklists that were typed up afterwards. Now the crew fills them in on the tablet, on the spot, and they go straight into the file. The network operator's inspector can review them the same day.

Site manager

Gas — low/medium-pressure mains · 30–60 employees · Flemish Brabant, Belgium

Frequently asked questions — gas

Does UPrince work for contractors of Cadent, SGN, NGN and WWU?

Yes. Jobs, programme, job sheets, tests and as-laid records run on one project number, whether you work directly for the network or as a subcontractor to a Tier 1.

Can we record tests per section?

Yes. Tests, checklists and photos are filled in on the job sheet and belong to the section, so the evidence is ready at handover.

What about plant enquiries and permits?

Plant enquiry results, service drawings and the permit reference belong to the job in UPrince, so the gang has them on site. The enquiries and the Street Manager permit themselves are still made in those systems.

Can we fit emergency work in between planned jobs?

Yes. An emergency becomes a job on the same programme, and you see straight away which planned work moves because of it.

Does it suit smaller contractors too?

UPrince scales from about 10 to more than 250 employees. Smaller firms usually start with job sheets, timesheets and planning.

Your gas jobs in one file?

A 30-minute demo on your own case, starting from a mains replacement scheme or a set of connections.